5.0 / 5

"The redesign of the main pumping system carried out by Just Add Agua not only resolved our persistent pressure drops but also optimized energy consumption by 22%. The applied engineering was impeccable."

Carlos Méndez, Operations Director

"NexFlow" Chemical Processing Plant

Project Context

Our plant faced critical challenges in the high-purity process water supply line. Unpredictable pressure fluctuations and drops were affecting final product quality and causing unscheduled shutdowns.

The Just Add Agua team conducted a comprehensive analysis of the existing system's fluid mechanics, identifying points of excessive friction and suboptimal pumping configurations. Their proposal included the redesign of several high-pressure pipe sections and the implementation of an adaptive control system.

  • Solution: Redesign of the main pumping system and distribution pipes.
  • Key Result: 22% reduction in the hydraulic system's energy consumption.
  • Additional Benefit: Complete elimination of pressure fluctuations, guaranteeing a constant and stable supply.

Project completed: October 2023

Sector: Chemical & Pharmaceutical Industry

← View all case studies